EICR Certificate Generator/ guides / buying a house

Electrical survey before buying a house

Most homebuyer reports look at the electrics from the hallway with a torch. If the property is older, that is not a survey — an EICR is. Here is the difference, and how to use it before you exchange.

What a homebuyer report says about electrics

A RICS HomeBuyer report is non-intrusive: the surveyor inspects what can be seen without lifting floorboards, removing fittings or testing circuits. Expect a traffic-light rating and wording like "the consumer unit appears dated; a full inspection by a registered electrician is recommended".

That is a signal, not an assessment. It cannot tell you whether the earthing arrangement is adequate, whether insulation resistance has degraded, or whether the RCD actually trips within the required time.

What an EICR adds

Homebuyer surveyEICR (inspection & testing)
AccessVisual, no dismantlingSamples accessories and inspection points; dead and live testing
InstrumentsNoneInsulation resistance, continuity, loop impedance (Zs), RCD trip times, polarity
OutputCondition rating and recommendationsSchedule of circuits plus observations coded C1, C2, C3, FI
Useful forOverall condition, budget planningDeciding whether to buy, renegotiate, or walk away

When it is worth commissioning one

How to read the result in a negotiation

Codes are not a repair list, they are a risk ranking:

Ask for the actual observation text, not just "satisfactory / unsatisfactory". Sellers sometimes commission a report and quote only the overall verdict — the C2 lines are what you need to price the remedials.

Practical sequence before exchange

  1. Offer accepted → ask the seller for any existing EICR, EIC and building-regulation certificates. Free, and sometimes enough if recent.
  2. No recent report → commission an EICR through the buyer's access arrangement, with the seller's consent.
  3. Get quotes for the C1/C2 items while you are still inside the negotiation window.
  4. Decide: proceed, renegotiate against quotes, or walk. Do this before exchange, not after completion.
← All EICR guides · Generate an EICR PDF · C1/C2/C3/FI codes explained